Planning Repaints for Coastal Apartment Blocks

4 minute read

For an apartment building close to the harbour, an exterior repaint is one of the largest recurring costs a body corporate faces. It involves scaffolding or rope access, weeks of disruption, and a bill that lands on every owner. It is also one of the easiest costs to plan for, because paint wears in fairly predictable ways. The difference between a smooth repaint and a painful one is usually planning that started years earlier.

Why coastal blocks repaint differently

Paint on a building by the sea works harder than paint inland. Salt deposits on every surface, draws in moisture and keeps coatings damp. Strong ultraviolet light on clear days breaks down binders and fades colour, and Wellington’s wind drives rain into joints and cracks that would stay dry in a calmer city. The result is that coastal coatings tend to chalk, crack and lose adhesion sooner, especially on the elevations facing the prevailing weather.

Wear is rarely even across a building. A north-facing wall may fade badly from sun while a south-facing one stays sound in colour but grows mould. Sheltered areas under balconies or soffits, which rain never washes, can collect salt and break down earlier than exposed walls. That unevenness is the key to planning: a building does not always need every face painted at the same time.

The long-term maintenance plan

Every body corporate in New Zealand must have a long-term maintenance plan. Changes to the Unit Titles Act that took full effect on 9 May 2024 tightened the rules, particularly for larger buildings. In general, a plan must cover at least 10 years. For large developments, those with 10 or more units, the plan must cover 30 years and be reviewed at least every three years, or sooner if something comes up that would materially affect it. Plans also need to summarise the current state of the common property and set out how the work will be funded.

The Unit Titles maintenance guidance explains these duties in more detail.

A 30-year horizon is useful for repaint planning because it forces the plan to show several full painting cycles, not just the next one. That makes it much easier to see whether the long-term maintenance fund is building at the right rate.

What a good repaint entry looks like

A vague line reading “exterior repaint, year 8” is better than nothing, but a useful plan goes further:

  • Which elevations and surfaces are included, and which are coated with something else, such as metal cladding or precast concrete.
  • The coating system currently on the building, ideally with product names and the date of the last full repaint.
  • Access method and its likely cost, because scaffolding or rope access can be a large share of the total.
  • Allowance for repairs found once access is in place, such as sealant replacement, flashing repairs and timber or concrete patching.
  • A note on any heritage or resource consent constraints on colour or materials.

Condition surveys drive the timing

The plan sets an expected year, but the building decides the real one. A condition survey every few years, by someone qualified to assess coatings and building envelopes, shows whether paint is ageing faster or slower than expected. Signs to look for include chalking that comes off on a hand, cracking at joints, blistering, peeling around fixings and staining from corroding metal.

If the survey shows one elevation degrading quickly, it can be cheaper to repaint that face early and push the rest back a few years. Staged work also spreads the cost and reduces disruption. The trade-off is that access costs are paid more than once, so staging only makes sense when the condition difference is real.

Washing between repaints

Regular washing is the cheapest way to stretch a paint system. Removing salt, grime and mould before they damage the coating can add years to a repaint cycle. Many coating manufacturers make washing a condition of their warranty, and coastal guidance generally calls for more frequent cleaning than inland. A washing programme belongs in the long-term maintenance plan alongside the repaint itself, with its own budget line.

Our notes on salt air and painted exteriors go into how salt damages coatings and what washing achieves.

Preparation is most of the job

Painters often say that the coating is only as good as what is underneath. On a coastal building, preparation means removing salt as well as dirt, because salt left under new paint can cause blistering and early failure. It also means replacing failed sealants, treating corrosion on fixings and flashings, and repairing cracks before painting. All of that takes time and is easy to cut when budgets are tight, which is exactly why the long-term plan should allow for it.

Wider building obligations

Repaints are also a chance to check the rest of the envelope. With scaffolding up, it costs little extra to inspect flashings, window seals, balcony membranes and roof edges. MBIE’s guidance on building safety and maintenance covers owners’ broader responsibilities for keeping buildings safe and in good repair.

A practical sequence

For a committee planning ahead, a workable sequence is:

  1. Confirm the coating system and date of the last repaint, and record them in the long-term plan.
  2. Commission a condition survey a couple of years before the planned repaint.
  3. Use the survey to decide whether to repaint in one go or stage by elevation.
  4. Check the long-term maintenance fund can cover the work, including access and repairs.
  5. Set up a washing programme to protect the new coating from day one.

For more on long-range planning in apartment buildings, see our piece on body corporate long-term maintenance.